There are numerous figures floating around on Fortescue and iron ore regarding various prices and costs, which has understandably caused some confusion. Due to frequently asked questions we have formed a basic summary of what the different price and cost metrics mean within the sector
Iron ore production levels (wet vs dry)
- Production is usually quoted in terms of wet metric tonnes (wmt), and the iron ore price is based on dry metric tonnes (dmt)
- To adjust from wet to dry tonnes, an 8% reduction is applied to the wet tonnes to adjust for moisture content
- It’s important to understand whether something is being quoted in ‘dmt’ or ‘wmt’
Iron ore price – index vs realised price
- The usually quoted iron ore price seen in the media is based on the index price using a 62% ferrous content (a benchmark measure of the quality of the ore)
- The realised price iron miners get for their product is not the index price – their realised price will depend on the relative quality of their product to the index benchmark
- Fortescue’s delivered price is adjusted for its quality and lower ferrous content – it has historically been able to sell its product at an 85% discount to the index price
- So if the iron ore index price is at US$58/dmt, Fortescue will be realising a price of about US$58 x 85% = US$49.3/dmt on its iron ore
C1 Cost
The C1 cost represents the ‘direct’ production costs of iron ore and is a commonly quoted figure. However, it does not represent the full cost of production. Fortescue’s C1 cost guidance for the second half of FY15 is US$25-26/wmt.
Download the Deloitte Corporate Bond Report
Delivered cost
The delivered cost includes the C1 cost, plus shipping, royalties and overhead costs. Fortescue’s delivered cost guidance for the second half of FY15 is US$35/wmt.
All-in cash cost
The all-in cash cost is the delivered cost, plus interest and sustaining capital expenditure. Fortescue’s all-in cash cost guidance for the second half of FY15 is US$41/wmt. The extra US$6/wmt above delivered cost is made up of interest at US$4/wmt and sustaining capex at US$2/wmt. It’s worth noting that interest is actually a relatively small part (<10%) of Fortescue’s overall cost of production – therefore it’s all-in cash cost is not overly sensitive to changes in its cost of funds.
Free cash flow breakeven price
- The free cash flow breakeven price generally means the index price level at which Fortescue is producing at breakeven on an all-in cash basis
- To determine the breakeven price, the first step is to adjust the all-in cost from ‘wet’ to ‘dry’ tonnes – so US$41/wmt is equivalent to US$45/dmt
- The next step is to gross up by the 85% product discount to get to an breakeven index price - so US$45/dmt / 85% = US$53/dmt which is the often quoted breakeven
- Some analysts also make a further adjustment for prepayments. This is where Fortescue has received cash upfront to deliver future tonnages
The relationship between currency and Fortescue’s costs
- Fortescue’s 2H15 cost guidance of between US$25-26/wmt assumes an average exchange rate of 0.80
- Fortescue's cash costs of production benefit from a weaker Australian dollar – so bondholders get a double benefit from a weaker Australian dollar
- The company has guided that every 1c weakening in the currency leads to a US$0.25-0.30 reduction in cash costs
- So if the currency is at 0.70, Fortescue’s C1 cost would reduce by about a further US$2.50/wmt below its 2H15 C1 cost guidance of US$25-26/wmt
The relationship between oil prices and Fortescue’s costs
- Fuel and energy costs make up approximately 12% of total C1 costs
- Lower oil prices reduced C1 costs by approximately US$0.26/wmt in the December 2014 quarter.
- Fuel and energy costs also have a significant impact on the cost of shipping which averaged US$8.50/wmt in the December 2014 quarter